Testing

Re-certifying an existing cabling floor

How to test plant you did not install: survey reality, choose limits, remediate fails and reset documentation.

Refresh, tenant change or warranty transfer often needs evidence on existing plant — including installs another firm left behind.

Survey first

  • Do IDs exist and match panels?
  • Is the category even known?
  • Which outlets are live vs abandoned?

Without a survey, “certify everything” is a fantasy scope.

Test limits

Set the tester to limits that match the claimed category — or to the category you can honestly support after inspection. Testing Cat6A plant to Cat5e limits is not a Cat6A certificate.

Remediation path

Fails need a commercial decision: fix, abandon, or replace. Retest after remedy. Update legends.

Engage

Testing & Certification · related reading: What a certification pack should include.

← All insights

Want this scoped for your site?

Send a drawing, outlet schedule or relocation date — we outline the next practical step.

CallGet Quote